Skip to main content

FAQ

FAQ

Where are your projects stored?​

Your projects are stored on iCloud via CloudKit and are accessible from any device signed in with the same Apple ID. Devices also keep a local copy that syncs automatically.

CloudKit

QuickPlanX can also export projects as .quickplanx files for backup or sharing. To open these files, import them to QuickPlanX as new iCloud-stored projects.

How do I quickly scroll the timeline to Today?​

QuickPlanX marks today's date with a vertical red line in the Gantt chart.

To navigate quickly, double-click the timeline header at the top of the Gantt chart. Repeated double-clicks cycle through three dates:

  • The project start date
  • Today
  • The project finish date

Note: This shortcut is active when today falls within the project timeframe.

Can I specify just start and finish dates with task names, and let QuickPlanX do the rest?​

No. QuickPlanX is built for manual project scheduling and does not auto-generate schedules from minimal inputs.

To build a workable schedule, define task durations and dependencies between tasks so the timeline reflects your actual project constraints.

How do I create a project from a template?​

Any existing project in QuickPlanX can serve as a template. For details, see how to use a project as a template.

What is the difference between "% Complete" and "Physical % Complete"?​

These two fields track progress from different angles:

  • % Complete is time-based, measuring how much of the task's scheduled duration has elapsed.
  • Physical % Complete measures actual work delivered. You update this value manually to reflect delivered outcome regardless of elapsed time.

For full field definitions, see task fields.

Does QuickPlanX provide the same features as Microsoft Project?​

QuickPlanX is not a clone or port of Microsoft Project. It is an independent planning tool designed specifically for macOS, iOS, and iPadOS with its own workflow and interface.

While both tools handle Gantt-based project management, you should not expect a one-to-one feature match with Microsoft Project. For an in-depth comparison of feature scope, licensing, and planning philosophy, see our guide on choosing a Microsoft Project alternative for Mac, iPad, and iPhone.