Fields Customization

QuickPlanX task fields include core fields, customizable fields, and baseline fields. QuickPlanX lets you customize the fields that you use to create your project. You can change their visibility, titles, order, and other properties depending on the field type.

  • Visibility: Choose the fields that you want to use for the project.
  • Display title: Rename the fields to match your preferences.
  • Display order: Arrange the fields in the order that you want them to appear.
  • Display format, branch value policy, and other properties: Adjust the settings of the fields based on their type.

Entry​

To access the fields customization, go to the Project Settings and tap the Choose Fields option.

Fields Setting

Choose Fields to Use​

You don't have to use all the fields that QuickPlanX provides. You can select the fields that are relevant for your project. To add a field to the visible list, tap the Add Visible Fields button on the toolbar or below the list and pick the field that you want to use.

Add Fields

Hide Visible Fields​

If you want to remove a field from the visible list, tap the x button next to the field name.

Hide Fields

You can also set the visibility of a specific field separately on the list and on the inspector. To do this, select a field and toggle the switches for display on Table View and Inspector.

Hide Field Separately

Edit Fields​

To edit a field, select it and change its properties. You can edit the title, visibility, and other settings based on the field type. For example, the single-line text fields and boolean fields have more properties you can set.

Edit fields

Display Order​

You can change the order of the fields on the list and on the inspector.

Fields order

On Mac​

Drag a field up or down to change its order.

On iPhone and iPad​

Long-press on a field until it changes color, then drag it up or down to change its order.

Video​

Watch the video below to see how to configure fields on Mac:

Watch the video below to see how to configure fields on iPad:

Notes​

  • The fields customization impacts the opened project. Different projects can have different settings.
  • The display title does not impact the usage of the fields.